KOC extends deadline for $150 m project bids

This news has been read 22201 times!

Kuwait Oil Company (KOC) has extended the deadline for submitting bids for a $150 million project to install pipelines for oil produced from Umm Naqa oilfield in Kuwait until March 22, reports Al-Rai daily quoting MEED Magazine. The report added that the scope of work on the project includes the installation of flow lines for oilproducing wells; reinforced plastic pipelines to get rid of flowing water; installation of hot water cocks; installation of wellhead connections; extension of existing heads and manifolds; a closure system for flow lines, carbon steel pipelines, pipelines, welding and installation work.

This news has been read 22201 times!

Related Articles

Back to top button

Advt Blocker Detected

Kindly disable the Ad blocker

Verified by MonsterInsights